Exterior work started

As part of my lab renovation there is also quite a lot of work to be done outside the lab. In this picture you see the door to the lab in the center. Above the door they used to have a wooden staircase. This will be replaced with a roof. Permanent stairs will lead all the way down to the lab from the right. A path going straight out of the lab will become a nice walkway. The doors will have glass in them, and a window will be made to the left of the door.

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s